Pi Kappa Phi Fraternity at Auburn University
This is the remodel project of the Pi Kappa Phi Fraternity house at Auburn University
front of the house 2/28/11
front of the house 2/28/11
pavilion 2/28/11
flag poled donated by associate class from Fall 2010
front door donated by Ken Middleton, father of member of Alpha Iota
back door 2/28/11
volleyball net and poles
back yard 2/28/11
volleyball court 2/28/11
storage shed 2/28/11
back yard 2/28/11
trophy case 2/28/11
foyer 2/28/11
formal room 2/28/11
kitchen 2/28/11
kitchen 2/28/11
kitchen 2/28/11
kitchen 2/28/11
kitchen 2/28/11
women's restroom 2/28/11
womens rest room 2/28/11
TV room
TV room
hallway to sleeping dorm 2/28/11
hallway to the house 2/28/11
study room 2/28/11
study room 2/28/11
laundry room 2/28/11
laundry room 2/28/11
laundry room 2/28/11
front of the house 12/18/10
view from the street 12/18/10
gazebo 12/18/10
front of the house 12/18/10
front of the house 12/18/10
side yard 12/18/10
back yard & volleyball court, light poles to be installed 12/18/10
back yard 12/18/10
party barn 12/18/10
women's bathroom, mirrors are not set yet.
crown moulding in the hallways of the house
hallway to the house, ramp on the right allows for wheel chair access of the entire house 12/18/10
hallway to the sleeping dorm 12/18/10
guest/archon bathroom 12/18/10
guest/archon bath 12/18/10
guest bath made handycapped accessable, with direct access to the archon's room
dining room - toward kitchen
dining room
dining room ceramic tile flooring
dining room door to hallway 12/18/10
dining room back wall 12/18/10
wire shelves to hold shower kits 12/18/10
two showers, two sinks and one toilet shared by 5 members 12/18/10
privacy door was added per Greg Linder's redesign of the bathrooms 12/18/10
bathroom dbl bowl vanities 12/18/10
tile above the shower walls 12/18/10
outswing bathroom doors was a change that Greg Linder recommended so the bathrooms had more room
bath room shared by 5 men 12/18/10
door to the study room 12/18/10
digital thermostats, one in every three bedrooms
bedroom closet and door to bathroom 12/18/10
sleeping dorm hallway 12/18/10
bedroom doors 12/18/10
closet for single man room 12/18/10
door for bedroom 12/18/10
two lights, smoke alarm, fire sprinkler in all bedrooms 12/18/10
flooring in all of the bedrooms 12/18/10
two man bedroom 12/18/10
two man room closet 12/18/10
end of 12/18/10 pictures
end of 12/18/10 pictures
front of the house 11-14-10
back walk way - 11-14-10
back yard 11-14-10
volleyball court 11-14-10
landscaping 11-14-10
landscaping 11-14-10
gazebo 11-14-10
party barn interior 11-14-10
party barn 11-14-10
sprinkler system valves 11-14-10
hall way between sleeping dorm and house 11-14-10
hallway in sleeping dorm 11-14-10
bath vanity and top 11-14-10
women's bathroom cabinet and top 11/15/10
new exterior doors, closures & hardware 11-14-10
back yard 10-25-10
volleyball court 10-25-10
party barn 10-25-10
walls primed for painting 10-25-10
back door 10-25-10
downspout drains 10-25-10
access pads on exterior door 10-25-10
hall way in sleeping dorm 10-25-10
study room - drywall hung 10-25-10
green board (water resistant) in laundry room 10-25-10
drywall is stocked 10-25-10
curb cut - handicap access 10-25-10
concrete walks behind the house 10-25-10
court yard door 10-25-10
insulation - interior and exterior walls 10-25-10
front of the house 10-10-10
side of the house 10-10-10
party barn
back 10-10-10
back 10-10-10
side of house 10-10-10
future volley ball court 10-10-10
new hydrant & water service vault 10-10-10
right side - 10-10-10
sleeping dorm 10-10-10
new back door 10-10-10
10-10-10
10-10-10 back of the house
front of the house 9/11/10
back yard 9/11/10
front of the house - 9/11/10
front of the house- new EIFS 9/11/10
sleeping dorm front porch 9/11/01
front porch - new EIFS 9/11/10
side porch - new EIFS
new concrete connecting front porch and side porch 9/11/10
door on the party barn 9/11/10
new air conditioners for the sleeping dorm 9/11/10
hallway from sleeping dorm to house 9/11/10
new instant hot gas water heaters 9/11/10
water service crossing Lem Morrison for the sprinkler system 9/11/10
hallway between house and sleeping dorm 9/11/10
old air handlers going to recycle center - 8-21-10
six new air handlers in the sleeping dorm 8-21-10
hall air handler moved to the closet 8-21-10
old water heaters were removed 8-21-10
red wires = new alarm system 8-21-10
Front yard 8-4-10
hall way between house and sleeping dorm - 8-4-10
foyer wall - 8-4-10
kitchen outside wall 8-4-10
EFIS cut back on kitchen wall 8-4-10
EIFS cut back- foundation exposed
new windows on the sleeping dorm 8-14-10
new windows on right side 8/4/10
new gutters & alum. facia under the gutters
new windows 8-4-10
inside the party barn 8/4/10
party barn 8/4/10
dining room back wall 7/18/10
back wall of dining room 7/18/10
right side of the house 7/18/10
EFIS cut back around the house
fireplace room 7//18/10
windows reframed 7/18/10
party barn 7/18/10
bedroom closet 7/18/10
hall way 7/18/10
dining room 7/18/10
party barn 7/18/10
front of house 6/18/10
right side of sleeping dorm
back of sleeping dorm 6/18/10
dirt against EIFS 6/18/10
behind the house 6/18/10
bathroom 6/18/10
hallway in sleeping dorm 6/18/10
termite damage 6/18/10
termite damage to window frame 6/18/10
bathroom 6/18/10
study room 5/25/10
5/25/10
demolition has begun 5/25/10
the demo team, John, Jim, & James
drywall in the dumpster 5/12/10
termite damage to window framing 6/18/10
Pi Kappa Phi at Auburn 4/9/10
Alpha Iota chapter house
Pi Kappa Phi at Aurburn 4/19/10
Sunday, June 20, 2010
Monday, May 3, 2010
pictures
Thursday, April 29, 2010
Remode project of the Pi Kappa Phi House at Auburn Universit